SECOND FLOOR CONCRETE is poured and has set. The staircase leads to the roof where all HVAC is hidden from sight. EAST SIDE facing 10th Street West — Exterior framing nearly complete. THE STAIRWELL before drywall is placed. Steel I-beams create the stairwell box. MADE OF STEEL — The superstructure of the building is completed in early 2020 and exterior framing begins. In the foreground and to the left the steel work for the ATM drive through stands tall and proud.